Thermal expansion in hidden fastener systems
I am Megan O'Brien. In a hypothetical scenario where high-density boards are installed with hidden fasteners during a cold snap, how do you manage the lack of expansion gap when the material eventually reaches summer temperatures? It is difficult to account for the specific moisture and temperature variables without knowing the exact site climate. I would suggest checking the manufacturer's specific installation guide and local code requirements, as those provide the only reliable path forward for managing this type of movement.